铺装部分基本采用拼接跳色的设计,将四- 五种不同规格或者面层的花岗岩石材组合拼接,通过多轮拼接对比,同时在施工细节的把控上做到细微处,保证每一片石材的精准落位,创造出一种和谐统一又蕴含变化的铺装效果。
The pavement part basically adopts splicing color design, splicing four to five different specifications or surface layers of granite stone combination, through multiple rounds of splicing comparison, at the same time in the construction details of the control to ensure the accurate placement of each piece of stone, creating a harmonious and unified pavement effect containing changes.
道牙处理/GAVEMENT
方案设计时整体车行道道牙均设置为立道牙,但在后期施工图过程中考虑前场界面的统一,将立道牙调整为平道牙,将水景,沥青道路,人行铺装三者统一标高,使得前场界面更加干净简洁。
In the design of the scheme, the overall vehicle road teeth are set as vertical teeth, but in the later construction drawing process, the unity of the front field interface is considered. The vertical teeth are adjusted to the flat teeth, and the elevation of the water feature, asphalt road and pedestrian pavement is unified, so that the front field interface is cleaner and simpler.
水景形成过程/WATERSCAPE
水景整个跨度约 50 米,且在地库顶板上, 由于水景面积过大后期很可能会出现不均匀沉降以及池底断裂的风险,而且完成面标高到顶板覆土超荷载,考虑到这些问题最终现场设置地垄墙后铺设钢混池底防止后期不均匀沉降以及换填陶粒满足荷载的要求。
The whole span of waterscape is about 50 meters. Due to the large size, uneven settlement and the risk of bottom fracture may occur in the later stage, and the excess load from the completed surface elevation to the roof overburden, in consideration of these problems, the ridge wall is finally set on site, and the steel concrete bottom is laid to prevent the uneven settlement in the later stage, and filling meets the requirements of load.
悬浮种植池/ SUSPENSION PLANTING POND
树池悬挑空间较大因此整个内部结构采用钢混一体浇筑成型,以及圆角考虑后期成本单独异形定制,避免大量材料和费用的浪费,悬挑部分过长考虑内部的照明以及整体效果内部安装地埋灯氛围照明。
The cantilever space of the tree pool is large, so the whole internal structure is made of steel and concrete. The rounded corners are customized separately to avoid the waste of a lot of materials and expenses. The overhang part is too long to consider the internal lighting and the overall effect.
台阶采用定制整石,以及踢面底部采用定制石材弧形倒角节省造价,且保证效果的品质展现以及细节化的处理。
The steps are made of customized whole stone, and the bottom of the kick surface is made of customized stone arc chamfering to save cost, and ensure the quality of the effect and the processing of details.
忆江画卷 /Picture scroll of Memory of River由于景墙纹理复杂,景墙需要提前排版按照纹理分布,在施工图细化时将不同的板材形状给予编号,且不同型号的板材开槽给出明确大样,整体加工后现场就可根据编号排布施工,保证图纸最终的落地性和可控性效果。Due to the complexity of the texture of the landscape wall, the landscape wall needs to be typesetted in advance according to the texture distribution. When the construction drawing is refined, different plate shapes are numbered, and different types of plates are slotted to give clear large samples. After the overall processing, the site can be arranged and constructed according to the number, to ensure the final landing and controllable effect of the drawing.
后场对景景墙/REAR FIELD TO VIEW WALL
景墙采用更加轻便的钢结构+ 爵士白大理石干挂的形式,最终效果更加轻盈。爵士白大理石先大板切割成小板,先后编号排版,保证最终呈现出完整石材纹理效果。
The view wall adopts a more lightweight steel structure + jazz white marble dry hanging form, the final effect is more light. Jazz white marble is first cut into small boards, successively numbered layout, to ensure the final appearance of a complete stone texture effect.
前场植物空间——万物生长
建筑前场空间打造与城市相接的第一界面,植物设计上简约干练,少即是多,利用悬浮台阶与植物空间的相互交融,弱化建筑材料的生硬感,打造生长中城市的设计理念。
The front space of the building is the first interface connecting with the city. The plant design is simple and concise, less is more. The interaction of floating steps and plant space weakens the rigidity of building materials and creates the design concept of growing city.